NEE supplies EN 10216-1 P195 seamless steel pipes in production methods including hot rolling, cold drawing, hot expansion, etc. to meet different application requirements. The specifications range widely, with outer diameters from 21.3mm to 762mm and wall thicknesses from 2.0mm to 130mm. Appearance inspection and material verification are also carried out to ensure product quality.
EN 10216-1 P195 seamless round pipes are widely used in pressure-bearing equipment such as boiler water pipes, smoke pipes, superheater pipes, air preheating pipes, etc.
Products Data
Chemical composition of EN 10216-1 P195 Steel Seamless Tubes
| Grade | C | Si | Mn | P | S | Cr | Mo | Cu | Ni |
| P195 | ≤0.13 | ≤0.35 | ≤0.70 | ≤0.025 | ≤0.020 | ≤0.030 | ≤0.08 | ≤0.30 | ≤0.30 |
Mechanical Properties of EN 10216-1 P195 Structural Steel Pipe
| Grade | Yield Strength (Mpa) | Tensile Strength (Mpa) | Elongation(%)L | Elongation (%)T |
| P195 | ≥195 | 320-440 | 27 | 25 |
EN 10216-1 Carbon Seamless Steel Tubes Wall Thickness Tolerances
| Outside | Tolerance on D |
Tolerances on T for a T/D ratio |
|||
| diameter D | | <= 0.025 | > 0.025 | > 0.050 | > 0.10 |
| <= 0.050 | <= 0.10 | ||||
| D <= 219.1 mm | ± 1 % or ± 0.5 mm | ± 12.5 % or ± 0.4 mm whichever is greater | |||
| D > 219.1 mm | whichever is the greater | ± 20 % | ± 15 % | ± 12.5 % | ± 10 %* |
Products display
EN 10216-1 P195 cold finished seamless steel tube

Why Choose GNEE
GNEE has passed ISO9001 quality management system certification and produces various types of steel products that meet CE and SGS standards.
GNEE processing services include cutting larger steel pipes into small sizes required by customers, cutting according to drawings, cutting into special sizes, welding cut pieces according to drawings, and galvanizing or surface painting the final processed parts; cutting and lathing of hollow steel pipe rods to make the outer diameter and wall thickness meet customer requirements.
If you would like to know more about our company or our products, please feel free to contact us. sales@gneetube.com
GNEE CUSTOMER VISIT

GNEE FACTORY ENVIRONMENT

GNEE PACKAGING AND SHIPPING

FAQ
Q: Do you have quality control?
A: Yes, we have gained BV, SGS authentication.
Q: Can you arrange the shipment?
A: Sure, we have permanent freight forwarder who can gain the best price from most ship company and offer professional service.
Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 25-45 days if the goods are not in stock, it is according to quantity.
Hot Tags: en 10216-1 p195 seamless steel tubes, China en 10216-1 p195 seamless steel tubes manufacturers, suppliers, factory, alloy steel pipe available in stock, alloy steel pipe for nuclear power plants, ASTM A335 P1 P2 P5 P9 Seamless Alloy Pipes, alloy steel pipe with various lengths, alloy steel pipe for expansion, alloy steel pipe for robotics applications



