EN 10216-4 P255QL seamless pipes are usually used for services with a minimum temperature of -46°C. The capital letter "P" stands for pressure use; "255" indicates a minimum yield strength of 255MPa; "Q" indicates that the heat treatment is quenching and tempering; and "L" indicates that it is used for low temperature use.
The production process of P255QL alloy steel pipes supplied by GNEE includes hot rolling, cold drawing, hot expansion and other processes to obtain the required size and shape. Generally, P255QL steel pipes should be quenched and tempered. The quenching temperature (hardening temperature) should be 890°C to 930°C, while the tempering temperature ranges from 600°C to 680°C.
EN 10216-4 P255QL steel pipes usually have an outer diameter range of 10.2mm to 711mm and a wall thickness range of 1.6mm to 60mm. Specific size specifications can be customized according to user needs.
Products Data
EN 10216-4 P255QL Alloy Steel Round pipes Specification
Chemical component
| Steel grade | C | Si | Mn | P max |
S max |
Cr | Ni | Mo | Al total b min |
Cu c max |
Nb max |
Ti max |
V max |
||
| Steel name | Steel number |
||||||||||||||
| P255QL | 1.0452 | ≤ 0,17 | ≤ 0,35 | 0,40 to1,20 | 0,025 | 0,020 | ≤ 0,30 | ≤ 0,30 | ≤ 0,08 | 0,020 | 0,30 | 0,010 | 0,040 | 0,02 | |
Mechanical properties
| Steel Name | Steel Number | Yield Strength, MPa |
Tensile Strength, MPa |
Elongation A Longitudinal, % |
Elongation B Transverse, % |
|---|---|---|---|---|---|
| P255QL | 1.0452 | ≥255 | 360~490 | ≥23 | ≥21 |
Products display
En 10216-4 P255QL Seamless Alloy Steel Tubes

Why Choose GNEE
GNEE's annual production is about 30,000 tons, exported to all over the world, such as South Korea, Malaysia, Singapore, Vietnam, Philippines, Thailand, India, Pakistan, Bangladesh and other 56 countries.
GNEE constantly seeks improvement, listens to customers' opinions, and pays full attention to their specifications and suggestions. Looking forward to your inquiries! sales@gneetube.com
GNEE CUSTOMER VISIT

GNEE GROUP PARTICIPATED IN THE NECC EXHIBITION

GNEE FACTORY ENVIRONMENT

GNEE PACKAGING AND SHIPPING

FAQ
Q: What about your payment term?
A: Usually T/T or L/C, 30% deposit and 70% before delivery.
Q: what about your standard delivery date
A: 15~25 days after receiving deposit
Q: How about your capacity?
A: For steel pipes, 60,000 tons per month, 720,000 tons per year. For pipe fittings, 30,000 tons per year
Hot Tags: en 10216-4 p255ql seamless steel tube, China en 10216-4 p255ql seamless steel tube manufacturers, suppliers, factory, 304LN Stainless Steel Pipe, 15CrMoG Alloy Seamless Pipe, STS 370 grade low carbon steel pipe, SS 310 310S Pipes, 310 Stainless steel composite pipe, 1 4550 Stainless Steel Polished Pipe



