A210 GRC Heat Exchanger Tube

A210 GRC Heat Exchanger Tube

A210 Grade C heat exchange tube is a kind of medium carbon seamless steel tube produced according to ASTM A210/A210M standard, which is mainly used in boilers and superheaters.
Send Inquiry
Chat Now
Description

A210 GRC medium carbon seamless pipe Description

 

A210 Grade C heat exchange tube is a kind of medium carbon seamless steel tube produced according to ASTM A210/A210M standard, which is mainly used in boilers and superheaters. Below is the detailed information about A210 Grade C Heat Exchange Tubes:
Production method
Hot rolling

Delivery status
Hot rolled, heat treated

Product Specification
Outside diameter: 57mm - 762mm
Wall thickness: 3.0mm - 130mm

Application field: A210 Grade C seamless steel tubes
A210 Grade C seamless steel tubes are widely used in large thermal power boilers.

 

A210 GRC Hot-finished steel pipe Specification

Product name

Seamless carbon steel pipe / Line Pipe

Standard

ASTM A210 A210M

 

 

Size

Outer Diameter

Seamless:17-914mm 3/8"-36"

Wall Thickness

SCH10 SCH20 SCH30 STD SCH40 SCH60 XS SCH80
SCH100 SCH120 SCH140 SCH160 XXS

Length

Single random length/Double random length
5m-14m,5.8m,6m,10m-12m,12m or as customer's actual request

Ends

Plain end/Beveled,protected by plastic caps on both ends, cut quare,grooved,threaded and coupling,etc.

Surface Treatment

Bare,Painting black,varnished,galvanized,anti-corrosion 3PE PP/EP/FBE coating

Technical Methods

Hot-rolled/Cold-drawn/Hot-expanded

Testing Methods

Pressure test,Flaw detection,Eddy current testing, Hydro static testing or Ultrasonic examination and also with chemical and physical property inspection

Packaging

Small pipes in bundles with strong steel strips,large pieces in loose; Covered with plastic woven bags; Wooden cases;Suitable for lifting operation;Loaded in 20ft 40ft or 45ft container or in bulk;Also according to customer's requests

Origin

China

Application

Conveying oil gas and water

Trade Terms

FOB CIF CFR

MOQ

10 tons

Supply Capacity

5000 T/M

Delivery Time

Usually within 10-45 days after receipt of advance payment

 
A210 GRC medium carbon seamless pipe
 
A210 GRC High pressure boiler tube
A210 GRC High pressure boiler tube
A210 GRC Heat Exchanger Tube
A210 GRC Heat Exchanger Tube
A210 GRC Carbon Steel Boiler Tubing
A210 GRC Carbon Steel Boiler Tubing

FAQ

 

Q: Are you a manufacturer?
A: Yes, we are a manufacturer. GNEE Group is a well-known steel group in China with an annual sales volume of more than 10 million tonnes.
Q: Can we visit your factory?
A: You are warmly welcome, once we arrange your time, we will come to pick you up.
Q: Do you have quality control?
A: Yes, we are BV and SGS certified.
Q: Can you arrange shipment?
A: Of course we can, we have fixed freight forwarder, we can get the best price from most shipping companies and provide professional service.
Q: What is your delivery time?
A: It usually takes 7-14 days if the goods are in stock and 25-45 days if the goods are not in stock, depending on the quantity.

 

Hot Tags: a210 grc heat exchanger tube, China a210 grc heat exchanger tube manufacturers, suppliers, factory, ASME SA179 Pipe Tubes, seamless Q345B steel pipes, JIS G3456 STPT 480 seamless pipe, Carbon thick wall steel pipe JIS G3454 STPG 370, ASTM A213 seamless alloy steel tubing, EN 10216 1 P265 alloy seamless pipes

Send Message