E315 Seamless circular steel tubes Description
E315 Carbon Steel Seamless Pipe is a high-strength building material commonly used in structural applications. It complies with multiple international standards, including ASTM A519 (American Society for Testing and Materials Standard), EN 10297-1 (European Union Standard) and JIS G3445 (Japanese Industrial Standard).
E315 Seamless circular steel tubes for mechanical Specification
|
Place of Origin |
China |
|||
|
Alloy Or Not |
Is Alloy |
|||
|
Section Shape |
round |
|||
|
Standard |
EN10297 |
|||
|
Length |
12M, 6m, 6.4M |
|||
|
Grade |
E315, E235, E470, etc |
|||
|
Delivery Time |
8-14 days |
|||
|
Processing Service |
Bending, Welding, Decoiling, Punching, Cutting |
|||
|
MOQ |
5 ton |
|||
|
Technique |
hot cold/hot cold Seamless steel pipe |
|||
|
Packing |
Standard Sea-worthy Packing |
|||
|
Supply Ability |
1000 Ton/Tons per Month |
|||
|
Invoicing |
by the oretical weight |
|||
|
Tolerance |
±1% |
|||
|
Thickness |
Cold rolled:0.3mm-3.0mm Hot rolled:3mm-16mm Plate:18mm-60mm |
|||
E315 Chemical composition (%)
| composition | C | Si | Mn | P | S |
|---|---|---|---|---|---|
| Min | - | - | - | - | - |
| Max | 0.21 | 0.3 | 1.5 | 0.03 | 0.035 |
E315 Low Carbon Steel Tubes



FAQ
1. Q: Are you a manufacturer?
A:Yes, we are manufacturers. We have our own factory and our own company. I believe we will be the most suitable supplier for you.
2. Q: Can we visit your factory?
A: Sure, we welcome you to visit our factory , check our production lines and know more about our strength and quality.
3. Q: Do you have quality control system?
A: Yes, we have ISO, BV, MTC, certifications and our own quality control laboratory.Third party testing services are also available
4. Q: Can you arrange the shipment for us?
A: Yes, we have designated sea freight and railway freight forwarders with decades of experiences and we get the best price with earlist vessel and professional service.
5. Q: How long is your delivery time?
A: Generally it is 7days if we have the exact goods in our stock. If not, it will take around 15-20 days to get goods ready for delivery.
Hot Tags: e315 mild steel pipes and tubes, China e315 mild steel pipes and tubes manufacturers, suppliers, factory, seamless cold drawn low carbon steel pipe, Hydraulic strut pipe, STPG410 carbon steel pipe, ASTM A192 pipe, DIN 17175 St45 8 pipe, DIN 17175 St45 8 Seamless Steel Tubes



