S275JR Hot Finished Circular Hollow Section

S275JR Hot Finished Circular Hollow Section

S275JR steel pipe is a kind of carbon structural steel pipe, which is suitable for manufacturing all kinds of structural parts, such as drilling rigs, electric shovels, electric wheel dump trucks, excavators, bulldozers, all kinds of cranes, and hydraulic supports for coal mines and other mechanical equipment.
Send Inquiry
Chat Now
Description

S275JR hot-rolled Pipe Description

 

S275JR Hot Formed Hollow Tube is a European Norm (EN) standard carbon structural steel. During the hot forming process, S275JR steel can be moulded into the shape of a hollow tube, depending on the plasticity of the material and the control of the cooling process. Hot formed hollow tubes can be used in a wide range of engineering and construction projects due to their shape and strength properties.

 

S275JR structural steel pipe Specification

item

value

Place of Origin

China

Application

Fluid Pipe, Boiler Pipe, Drill Pipe, Hydraulic Pipe, Gas Pipe, OIL PIPE, Chemical Fertilizer Pipe, Structure Pipe

Alloy Or Not

Non-Alloy

Section Shape

Round

 

5mm - 300mm

Thickness

1.2 - 12 mm

Standard

EN

Certificate

ISO9001

Grade

S235JR, S275JR, S355JR, etc.

Surface Treatment

Hot Rolled

Tolerance

±1%

Processing Service

Bending, Welding, Decoiling, Punching, Cutting

Oiled or Non-oiled

Non-oiled

Delivery Time

8-14 days

Product name

Seamless Carbon Steel Pipe

MOQ

5 Tons

Length

Customized Accept

Payment terms

30%TT Advance + 70% Balance

Trade Terms

EXW/FOB.CFR/CIF/etc

 

S275JR Mechanical properties

Thickness
t
mm
Tensile Strength
σb
Mpa
Yield Point
σs
Mpa
Elongation at break or elongation
δ
%
t<3 430~580 ≥275 Note
3≤t≤16 410~560 ≥275 ≥23
16<t≤40 410~560 ≥265 ≥23
40<t≤63 410~560 ≥255 ≥22
63<t≤80 410~560 ≥245 ≥21
80<t≤100 410~560 ≥235 ≥21
100<t≤150 400~540 ≥225 ≥19
150<t≤200 380~540 ≥215 ≥18
200<t≤250 380~540 ≥205 ≥18

Note:

① nominal thickness t ≤ 1, elongation after break δ ≥ 15
② nominal thickness 1 <t ≤ 1.5, the elongation after break δ ≥ 16
③ nominal thickness 1.5 <t ≤ 2, after break elongation δ ≥ 17
④ nominal thickness 2 <t ≤ 2.5, after break elongation δ ≥ 18
⑤ Nominal thickness 2.5<t<3, elongation after break δ≥19

 
S275JR Hollow Steel Pipes
 
S275JR high tensile strength structural steel seamless pipe
S275JR high tensile strength structural steel seamless pipe
S275JR seamless mild steel pipe
S275JR seamless mild steel pipe
S275JR ms structural steel pipe
S275JR ms structural steel pipe

FAQ

 

Q : Can we visit your factory?

A: You are warmly welcome. Once we get your schedule, we will arrange a professional sales team to follow up with you.

Q : Are you a factory or a trading company?

A: We are a factory and one of the famous line pipe manufacturers in China. Our headquarter is located in Henan, China, since 2008.

Q : What is your MOQ (Minimum Order Quantity)?

A: 30 tonnes.

Q : How does your factory perform quality control?

A: We inspect every process from material to product to ensure product quality. SGS inspection is acceptable.

Q : What payment methods do you accept?

A: After you confirm our PI (Proforma Invoice), we will ask for your payment. We accept T/T, L/C.

Hot Tags: s275jr hot finished circular hollow section, China s275jr hot finished circular hollow section manufacturers, suppliers, factory, ASTM A312 Gr TP410 High Pressure Pipe, ASTM A312 UNS S30400 Pipes, ASTM A213 Gr T11 T12 Alloy Pipe, DIN 1 4878 stainless steel round tubes, DIN 1 4404 Stainless Steel Tubes Round, STPT410 is a carbon steel pipe

Send Message