ASTM A214 heat exchanger tubes are made of carbon steel and are widely used in heat exchangers, condensers and other similar equipment involving heat transfer processes.
GNEE supplies A214 condenser tubes with different surface treatments such as anti-corrosion oil, galvanized surface treatment, etc. We can provide fully customized surface treatments as per the requirements of our customers. And we can customize the steel tube size as per the needs of our customers.
Products Data
SA 214 Material Tubes Chemical Composition
| Grade | Composition, % | |||
| Carbon | Manganese | Phosphorus, max | Sulfur, max | |
| ASTM A214 / A214M | 0.18 | 0.27 to 0.63 | 0.035 | 0.035 |
Mechanical Properties of SA214 Tubing
| Tensile Streghth: | min ksi[Mpa] 47[325] |
| Yield Point: | min ksi[Mpa] 26[180] |
| Elongation: | ≥35% |
| Hardness: | ≤72HRB |
ASME SA214 welded Carbon Steel Boiler pipe specification
| Size | 4 to 219mm W. T.: 0.5 to 20mm |
|---|---|
| Schedule | SCH5, SCH10, SCH10S, SCH20, SCH30, SCH40, SCH40S, STD, SCH80, XS, SCH60, SCH80, SCH120, SCH140, SCH160, XXS |
| Length | Single Random, Double Random, Standard & Cut length |
| Form | SA214 Tubing are available in form of Round, Square, Hollow, Rectangular, Hydraulic, Coiled, Straight Boiler Tube, "U" Shape, Pan Cake Coils etc. |
| End | Plain End, Threaded, Beveled End, Screwed ends |
Products display
ASTM A214 Carbon Steel Welded Tube

Why Choose GNEE
GNEE has 14 steel production lines, 10 processing equipment for processing, bending, coating, heat treatment, cutting, drilling, beveling, tempering, surface treatment, etc., complete testing equipment and strong technical force. The annual production capacity is more than 60,000 tons.
Our products are exported to more than 60 countries and regions including Russia, Canada, India, Brazil, and Southeast Asia.
If you would like to know more about our company or our products, please feel free to contact us. sales@gneetube.com
GNEE CUSTOMER VISIT

GNEE FACTORY ENVIRONMENT

GNEE PACKAGING AND SHIPPING

FAQ
Q.Where are you located? Can I visit you?
A.Sure, you are welcome to visit our factory anytime.
Q.What is your after-sales service?
A.We provide after-sales service and 100% quality assurance for our products.
Q.What is your delivery time?
A.Delivery time is usually about 1 month, if we have stock, we can ship within 7 days.
Hot Tags: astm a214 carbon steel welded tube, China astm a214 carbon steel welded tube manufacturers, suppliers, factory, EN 10216 1 Seamless steel tubes, STS 480 thermal insulation steel pipe, STPG370 Carbon Steel Seamless Pipe, P235TR2 steel pipe, ASTM A210 gr A1 seamless pipe, A53 black pipe carbon steel



