Cold-rolled Welded Tubes

Cold-rolled Welded Tubes

Delivery Time: 7-15 Days
MOQ: 2 Ton
Price Term: CIF CFR Fob EXW
Send Inquiry
Chat Now
Description

Cold rolled welded pipe is the use of steel strip or steel plate from the steel mill through the press or cold rolled welded pipe machine to produce a round cold rolled welded pipe, and then using two bonded welding or submerged arc welding welding welding molding, welded pipe manufactured using this method can be called cold rolled welded pipe. Cold rolled welded pipe than the seamless steel pipe cost, high production efficiency, can be processed size and thickness of a wide range of billets used mainly in steel plate. Cold rolled welded pipes are more resistant to corrosion in acidic environments.
GNEE Group, as a well-known steel pipe manufacturer, can provide cold rolled welded pipe, from production to testing, to packaging, to transportation, to provide customers with one-stop service. If you need Cold Rolled Welded Pipe, please contact us immediately.

electric welded tubing

Cold Rolled Welded Steel Tube Specification

Product Name Cold Rolled Welded Steel Tube

Shape

Round Square Rectangle 

Material

Q195-Q34510#-45#195-Q345GrB-Gr5DIN-S23JIS-SS4JIS-SPH 040A10

Technique

Cold Rolled, Hot Rolled, ERW

Surface treatment

Black annealing,bright annealing,None annealing

Standard

ASTM, DIN, JIS, BS

Delivery times

Delivered within 30 days after receipt of deposit

Package

1.tightened with metal beit and plastic wrapped

2.According to customer's requirement

Application

Widely used in furniture,interior,decoration,fluid pipeline,petroleum and nat industry,drilling,pipeline,structure

cold rolled tube

FAQ

Q1: What's your terms of payment?
A: 30%T/T as the upfront deposit, 70% before delivery, We will show you the photos and package before you pay the balance.
Q2: What's the terms of delivery?
A: EXW, FOB, CFR, CIF
Q3: What's the terms of packing?
A: Generally,we pack our goods in bundles or coils with rods or belts, we could also pack the goods as the customers' requirement.
Q4: What's your delivery time?
A: For stocks, we could transport the goods to loading port within 7 work days after we received the deposit.For productionperiod, it usually takes about 15 days to 30 days after we received the deposit.
Q5: Could you produce according to the samples?
A: Yes, we can customer-made by your samples or technique drawings, we can build the mold and fixtures.

Hot Tags: cold-rolled welded tubes, China cold-rolled welded tubes manufacturers, suppliers, factory, Cold drawn seamless pipe, S275JOH carbon steel pipe, UNS S30403 304L Stainless Steel Pipes, ASTM A53 Class B pipe, 1 4841 heat resistant stainless steel pipe, DIN 1 4404 Seamless Pipes

Send Message