P195TR2 Cold Finished Seamless Steel Tube

P195TR2 Cold Finished Seamless Steel Tube

EN 10216-1 P195TR2 Cold formed seamless tubes are non-alloyed steel tubes with specific mechanical properties and chemical composition, suitable for the manufacture of components requiring high strength and good low temperature toughness.
Send Inquiry
Chat Now
Description

P195TR2 Seamless Carbon Steel Tube Description

 

EN 10216-1 is a European Union-wide standard entitled 'Seamless steel tubes and pipes for pressure applications - Technical conditions of delivery Part I: Unalloyed steel tubes and pipes with specified room temperature behaviour'. Under this standard, P195TR2 is a type of pipe described.

Specifically, P195TR2, where 'P195' refers to a tube with a minimum yield strength of 195 Newtons per square millimetre, and 'TR2' indicates that the tube complies with specific technical conditions, including requirements for impact properties and aluminium content. This type of tube is commonly used for the manufacture of mechanical components that require high strength and good toughness.

 

P195TR2 steel seamless tube for boiler Specification

Product Name
Seamless steel pipe
Out Diameter
1/2 inch - 36 inch (21.3mm-914.4mm) or customization
Thickness
2.11mm-60mm or customization
Length
1-12m or customization or customization
Protection
Plastic caps
Pipe ends
Plain, beveled, threaded, socket with holes, with PVC clap / coupling / clamp or as customers requirement
Technique
Cold Rolled, Cold Drawn, Cold Finish
Standards
API / 5L / API / 5CT / ASTM / ASME / DIN / BS
Packing terms
Labeled and bundled together with steel strip
Surface Treatment
1. Galvanized
2. PVC,Black and color painting
3. Transparent oil,anti-rust oil
4. According to clients requirement
 
 
P195TR2 Seamless steel tubes for pressure purposes
 
P195TR2 Low Pressure Seamless Boiler Steel Tube
P195TR2 Low Pressure Seamless Boiler Steel Tube
P195TR2 Non-alloy steel tubes with specified room temperature properties
P195TR2 Non-alloy steel tubes with specified room temperature properties
P195TR2 steel seamless tube for boiler and economizer
P195TR2 steel seamless tube for boiler and economizer

FAQ

 

Q: How about the MOQ? If my first order qty is small, will you accept?
A: We would like to do our best to support your trial order qty, so even 1 pc or 1 kg is ok to start cooperation; because we have confidence to move on second order with your esteemed company.

Q: What is your payment terms ?
A: Commonly two payment term for new customers:
1) 30% T/T as deposit , 70% balance against B/L copy;
2) 100% Irrevocable L/C at sight;If you need any other terms, pls feel free to contact us too, we will try our best.

Q: How long is your delivery time?
A: Our daily inventory is more than 8000 tons, so for common product size, just need 5 days from stocks; if the special size from new production, delivery 7 days.

Q: How about the samples ? is it free or extra fees?
A: Yes, we would like to supply the samples before order; if the samples from stock, it will be free; if the samples from new
production, we will charge some reasonable cost, but this amount will be deducted from your first order invoice.

 

Hot Tags: p195tr2 cold finished seamless steel tube, China p195tr2 cold finished seamless steel tube manufacturers, suppliers, factory, ASTM A213 Gr T11 T12 Alloy Pipe, 321 seamless steel pipe, SS UNS Seamless Pipe, 1 4307 Stainless Steel Seamless Pipe, DIN 1.4550 Stainless 347 Pipe, EN 10216 1 P195TR1 seamless pipes

Send Message