P195TR2 Steel Seamless Tube For Boiler

P195TR2 Steel Seamless Tube For Boiler

EN 10216-1 P195TR2 is an EU standard for seamless boiler tubes, specifically for use as seamless tubes in pressure equipment.
Send Inquiry
Chat Now
Description

P195TR2 Low Pressure Seamless Boiler Steel Tube Description

 

EN 10216-1 P195TR2 is a seamless boiler tube under the European Union standard, specifically used for seamless steel tubes for pressurised equipment.P196TR2 is a lower grade tube in the EN 10216-1 boiler tube series and is suitable for use in industries and applications with general requirements.P195TR2 tubes are commonly used in the manufacture of boiler water tubes, flue gas tubes, superheater tubes and air preheater tubes for equipment components at room temperature and high pressure. equipment components under high pressure.

 

P195TR2 Seamless Carbon Steel Tube Specification

Product name

P195TR2 Carbon Steel Pipe

Technical standard

Cold rolling/hot rolling

Materials

Carbon Steel

Standard

EN10216-1

Certificate

API,ISO,SGS

trade clause

FOB CIF EXW CFR

payment clause

30% TT 70% final payment

final payment

8-14days

stock size

Wall Thickness:0.6mm-20mm;Outer Diameter:8mm-610mm;Length:As customer requirements

Applications

Water engineering, petrochemical industry, chemical industry, electric power industry,agricultural irrigation, and urban

Surface treatment

Galvanized, PVC black and color paintingTransparent oil ,anti-rust oilAccording to clients requirement

 
P195TR2 Low Pressure Seamless Boiler Steel Tube
 
P195TR2 Pressure Seamless Steel Tube with specified room temperature
P195TR2 Pressure Seamless Steel Tube with specified room temperature
P195TR2 steel seamless tube for economizer
P195TR2 steel seamless tube for economizer
P195TR2 steel seamless tube for superheater
P195TR2 steel seamless tube for superheater

FAQ

 

1.How long is your delivery time?
According to the quantity.Generally within 2-7 days if in stock.And 15-20 days if not in stock.

2.What is your payment terms?
A: By T/T 30% in advance ,and 70% before delivery.
B:100% L/C at sight.
C:By T/T 30% in advance,and 70% L/C at sight.

3.Do you provide samples ? Is it free?
Yes, we offer the sample for free but do not pay for the cost of freight.
4.What if the customer is not satisfied?
If there is a problem with the product,we take full responsibility.
If there is a problem in the transportation process,we will help you to solve it.

 

 

Hot Tags: p195tr2 steel seamless tube for boiler, China p195tr2 steel seamless tube for boiler manufacturers, suppliers, factory, ASTM A53 Class B pipe, SA210 Gr A1 Carbon Steel Pipe, seamless cold drawn low carbon steel pipe, carbon steel round tube, P195GH seamless pipe, STPG370 Carbon Steel Seamless Pipe

Send Message