P265GH seamless carbon steel pipe is a European standard carbon steel pipe with outstanding plasticity, resistance, cold bending function and welding function, which is used in petroleum, chemical, power station, boiler and other occupations for the manufacture of reactors, heat exchangers, separators, ball tanks, oil and gas tanks, nuclear power reactors pressure shells, boiler steam packages, liquefied petroleum gas cylinders, and high-pressure water in hydropower stations.

P265GH Carbon Steel Boiler Pipe Specification
| Product Name | Seamless Boiler Tube | |
| Size | OD | 12.7mm-610mm |
| Thickness | 1.5mm-45mm | |
| Length | SRL,DRL,5.8M 6.0M,11.8M.12M | |
| Steel Standard | EN10216-1/EN10216-2 | |
| Steel Grade | Grade P195 /P235 /9265 TR1&2 P195/235/265 GH 13CrMo4-5 10CrMo9-10 ect. | |
| Process | hot rolled/cold drawn/cold rolled | |
| Usage | High temperature service | |
| Surface | Bared Black Painting, Galvanized,Coating | |
| Proctor | Plastic cap | |
| Package | Bundles, Bulk,PVC bags,Plywood case, Caps | |
| Inspection | With Hydraulic Testing, Ultrasonic testing or X-ray Test | |
| Certificate | ISO9001;2000 | |
| Date of Delivery | Less Than 15 Days According To The Quantity | |
| Payment: | L/C or T/T | |
| Port of Shipment | Xingang,Tianjin,Shanghai,Qingdao China | |

GNEE Service

GNEE Certification

FAQ
Q: Can we visit your factory?
A: Of course, we welcome you to visit our factory on site or visit our production line through online video to understand our strength and quality. We will arrange a professional team to serve you.
Q: How do you ensure the quality of your products?
A: All products must be inspected three times during the entire manufacturing process, including production, cutting and packaging. Factory inspection report is provided with the goods. If necessary, third-party inspection such as SGS is acceptable.
Q: How can I get samples? What's the fare?
A: Depending on the specifications of the product, we are sure to provide free samples or paid samples. You just need to provide us with your needs.
Q: What is your delivery time?
A: Different products and purchase quantities have different delivery times. Products will be delivered as soon as possible on the basis of quality assurance. Usually, it takes 7-14 days if the goods are in stock. If the goods are out of stock or customized, it will take 25 to 45 days.
Hot Tags: p265gh seamless steel carbon pipe, China p265gh seamless steel carbon pipe manufacturers, suppliers, factory, ASME SA179 heat exchanger tube, JIS G3455 STS 480 high temperature steel pipe, S235JRH EN 10219 Seamless Pipes, Alloy 309 stainless steel, JIS G3455 STS 410 pipe, Stainless Steel 317L Seamless Pipe



