S275JR Hot Finish CHS Tubes

S275JR Hot Finish CHS Tubes

S275JR Hot Formed Hollow Pipe is a European Norm (EN) carbon structural steel used in building and various engineering structures.
Send Inquiry
Chat Now
Description

S275JR Circular Hollow Section Steel Tube Description

 

S275JR Hot Formed Hollow Pipe is a European Norm (EN) standard carbon structural steel used in buildings and various engineering structures.The yield point of S275JR steel is ≥270MPa, tensile strength is 430-580MPa, elongation after break should be ≥14%, impact test temperature is 20℃, impact work should be ≥27J.
As this steel is widely used in the field of building and engineering structures, S275JR Hot Formed Hollow Pipe is commonly used to make various building and supporting structures.

 

S275JR CS Hot Finished Round Pipes Specification

Standard
EN10025
Tolerance
±1%
Place of Origin
China
 
Henan
Out Diameter:
20~406mm(1/2inch~16inch)in theory
Delivery Time
Within 10-20 working days after receipt the deposit payment.
Thickness
1.2~15.7mm
Length
Any Length Below 16 Meter
Main Material:
 S235JR,S235J0,S235J2,S275JR,S275J0,S275J2,S450J0,S355J0,S185,S355JR,S355K2,S235J0,S275J0,S355J2
Surface Treatments
Bared,Galvanized, Oiled, Color Paint, 3PE, Or Other Anti-corrosiveTreatment
Processing Service
Welding, Decoiling, Punching, Cutting, Bending
Shape
Round
Delivery Time:
Within 5-15 working days after receipt the deposit payment.
Usage
Used For Water, Gas, Stream, Combustible Fluids And Other LiquidDelivery
 
S275JR Hot Formed Circular Hollow Sections
 
S275JR ms structural steel pipe
S275JR ms structural steel pipe
S275JR Mild Steel Circular Hollow Section
S275JR Mild Steel Circular Hollow Section
S275JR CS Hot Finished Round Pipes
S275JR CS Hot Finished Round Pipes

FAQ

 

1. How to get your quotation?
You can leave us a message and we will reply to every message in time. You can also find our contact information on the contact page.
2. Can I get a sample before ordering?
Of course you can. Usually our samples are free of charge. We can produce according to your samples or technical drawings. We can make moulds and jigs.
3. What is your delivery time?
The delivery time is usually about 1 month (usually 1*40FT). If we have stock, we can ship within 2 days.
4. What are your payment terms?
Our usual payment terms are 30% in advance and the balance by bill of lading. We also accept letter of credit. Our payment terms are Exw, FOB, CFR, CIF. 

 

Hot Tags: s275jr hot finish chs tubes, China s275jr hot finish chs tubes manufacturers, suppliers, factory, Low Carbon Steel ASME SA179 Pipe, EN 10219 S355JOH Carbon Steel Pipes, EN 10216 1 P265 Seamless Pressure Steel Pipe, ASTM A179 Mild Steel Condenser Tubing, ASTM A192 Seamless Carbon Steel Tubes, JIS G3454 STPG 410 pipe

Send Message