A192 seamless boiler tubes are seamless carbon steel boiler tubes under American Standard ASTM/ASME (ASTM A192/ASME SA192), specially designed for high-pressure boiler systems, suitable for operating temperatures of 450℃~650℃, pressure ≤9.8MPa. Pressure ≤9.8MPa severe working conditions
Chemical composition:
Carbon content 0.06% ~ 0.18% (low carbon design to enhance weldability and toughness), manganese content of 0.27% ~ 0.63%, phosphorus, sulfur are ≤ 0.035% (to control impurities to enhance corrosion resistance) (Control impurities to enhance corrosion resistance).
Silicon content ≤ 0.25% (to enhance the deoxidation ability and material strength).
Mechanical properties:
Tensile strength ≥325MPa, yield strength ≥180MPa, elongation ≥35% (to ensure structural stability under high pressure) .
Hardness requirements: tube diameter or wall thickness ≥ 5.1mm, Brinell hardness ≤ 137HB; wall thickness <5.1mm, Rockwell hardness ≤77HRB (to prevent brittle fracture).

A192 Seamless Steel Carbon Pipe for High Pressure Specification
| Product Name | Seamless Carbon steel pipe | |
| Size | OD | 12.7mm-710mm |
| Thickness | 3mm-45mm | |
| Length | SRL,DRL,5.8M,11.8M | |
| Steel Material | ASTM A192 | |
| Process | Hot rolled/hot expansion/cold drawn/cold rolled | |
| Usage | High Pressure service | |
| Surface | Bared Black Painting, Galvanized,Coating | |
| Proctor | Plastic cap | |
| Package | Bundles, Bulk | |
| Inspection | With Hydraulic Testing, Ultrasonic testing or X-ray Test | |
| Certificate | ISO9001;2000 | |
| Date of Delivery | Less Than 15 Days According To The Quantity | |
| Payment: | L/C or T/T | |
| Port of Shipment | Tianjin, Shanghai, Ningbo, China | |

FAQ
Q: What is the minimum order quantity?
A: 1 tonne, but the larger the order quantity, the more favourable the price.
Q: How can I get a sample to check your quality? How long will it take to get the sample?
A: After the price is confirmed, we will provide free samples for your evaluation.
After you confirm the details of the samples, the samples will be ready in 3-7 days and will be delivered within 3-5 days by express delivery.
Q: What payment methods do you accept?
A: We accept T/T, L/C, Western Union, Paypal.
Q: What are your shipping terms and delivery time?
A: FOB, CFR, CIF, 15-60 days.
Q: Do you have discounts?
A: We will surely do our best to help you get discounts with the best price and the best service.
Hot Tags: a192 carbon steel boiler tube, China a192 carbon steel boiler tube manufacturers, suppliers, factory, 15mnv Alloy Steel Seamless Pipe, S31000 stainless steel pipe, DIN 1 4307 Stainless Steel Fabricated Pipes, astm b677 tp 904l Pipe, Acid resistant 310H stainless steel pipe, A53 black pipe carbon steel



