EN 10219 S355JOH Carbon Steel Seamless Pipe

EN 10219 S355JOH Carbon Steel Seamless Pipe

EN 10219 S355JOH is a non-alloy and fine grain steel for structural hollow sections.
Send Inquiry
Chat Now
Description

EN 10219 is a European standard that specifies the requirements for cold-formed welded hollow steel pipes of non-alloy and fine-grained structural steels.
EN 10219 S355JOH EN 10219 S355JOH Steel Hollow Section pipes are mainly used in structural applications such as construction, bridges, mechanical engineering, etc.
The "S" in EN 10219 S355JOH Steel Pipe stands for structural steel, "355" means that its minimum yield strength is about 355MPa, "J" means that it has sufficient impact toughness at -20℃, "O" means that the steel pipe is a hollow section, and "H" means that it is hot rolled.
EN 10219 S355JOH seamless steel pipes are widely used in various structural applications that need to withstand large pressures and loads due to their high strength and good low-temperature impact toughness.

Products Data
Carbon Steel S355JOH Seamless Pipes Chemical Composition
Chemical Composition (wt.%) Maximum Content
Carbon (C) 0.22
Silicon (Si) 0.55
Manganese (Mn) 1.60
Phosphorus (P) 0.035
Sulphur (S) 0.035
Chromium (Cr) 0.25
Nickel (Ni) 0.50
Copper (Cu) 0.20
Nitrogen (N) 0.012
Carbon Steel EN 10219 S355JOH Welded Tubes Mechanical Composition
Mechanical Properties Minimum Value
Yield Strength (Rp0.2) 355 MPa
Tensile Strength (Rm) 470-630 MPa
Elongation (A) Not Specified (Typically ≥ 21% for thickness ≤ 16mm)
Impact Toughness (at -20°C) ≥ 27 J

 

Products display

EN 10219 S355JOH Tubing

JIEN 10219 S355JOH Carbon Steel Seamless Pipe

 

Why Choose GNEE

GNEE's annual production is about 30,000 tons, exported to all over the world, such as South Korea, Malaysia, Singapore, Vietnam, Philippines, Thailand, India, Pakistan, Bangladesh and other 56 countries.
GNEE constantly seeks improvement, listens to customers' opinions, and pays full attention to their specifications and suggestions. Looking forward to your inquiries! sales@gneetube.com

GNEE CUSTOMER VISIT

Gnee Customer visit

GNEE GROUP PARTICIPATED IN THE NECC EXHIBITION

Gnee Customer visit

GNEE FACTORY ENVIRONMENT

Gnee Factory environment

GNEE PACKAGING AND SHIPPING

Gnee Packaging and shipping

FAQ

Q: What about your payment term?
A: Usually T/T or L/C, 30% deposit and 70% before delivery.
Q: what about your standard delivery date
A: 15~25 days after receiving deposit
Q: How about your capacity?
A: For steel pipes, 60,000 tons per month, 720,000 tons per year. For pipe fittings, 30,000 tons per year
Q: what about your package
A: Usually as per customer's requests.

Hot Tags: en 10219 s355joh carbon steel seamless pipe, China en 10219 s355joh carbon steel seamless pipe manufacturers, suppliers, factory, mosque construction structural pipe, steel pipe for mosques, structural steel pipe for synagogues, temple building steel pipe

Send Message