The production process of P195TR2 seamless steel pipe strictly complies with the provisions of European standard EN 10216-1.
EN 10216-1 P195TR2 steel pipe is mainly made of carbon steel, which has good mechanical properties and machinability. During the production process, the steel pipe needs to undergo multiple processes of processing and heat treatment.
It can withstand high pressure and temperature. At the same time, it also has good corrosion resistance and weldability, which is convenient for processing and installation. The size and specifications can be customized according to customer needs.
P195TR2 seamless carbon steel pipe is widely used in petroleum, chemical, electric power, boilers, pressure vessels and other fields.
Products Data
Mechnical property for P195TR2 steel pipes:
|
Yield strength (≥Mpa) |
T≤16 |
16 |
40 |
60 |
|
195 |
185 |
175 |
- |
|
|
Tensile strength (≥Mpa) |
320-440 |
|||
Chemical composition fo P195TR2 steel pipes (Heat Analysis Max%)
|
C |
Si |
Mn |
P |
S |
Cr |
Mo |
|
0.13 |
0.35 |
0.70 |
0.025 |
0.020 |
0.30 |
0.08 |
|
Ni |
Alt |
Cu |
Nb |
Ti |
V |
Cr+Cu+Mo+Ni |
|
0.30 |
0.02 |
0.30 |
0.01 |
0.04 |
0.02 |
0.70 |
Steel Standard:EN 10216-1
Rolling Type:Hot Rolled,Cold Drawing
Wall Thickness:1.25mm--60mm
Diameter:1/4 inch--36 inch
Length:1000mm-18000mm
Products display
EN 10216-1 P195TR2 Cold Drawn Seamless Steel Tube

Why Choose GNEE
GNEE has 14 steel production lines, 10 processing equipment for processing, bending, coating, heat treatment, cutting, drilling, beveling, tempering, surface treatment, etc., complete testing equipment and strong technical force. The annual production capacity is more than 60,000 tons.
Our products are exported to more than 60 countries and regions including Kazakhstan, Canada, India, Brazil, and Southeast Asia.
If you would like to know more about our company or our products, please feel free to contact us. sales@gneetube.com
GNEE CUSTOMER VISIT

GNEE FACTORY ENVIRONMENT

GNEE PACKAGING AND SHIPPING

FAQ
Q.Where are you located? Can I visit you?
A.Sure, you are welcome to visit our factory anytime.
Q.What is your after-sales service?
A.We provide after-sales service and 100% quality assurance for our products.
Q.What is your delivery time?
A.Delivery time is usually about 1 month, if we have stock, we can ship within 7 days.
Hot Tags: en 10216-1 p195tr2 seamless steel pipes, China en 10216-1 p195tr2 seamless steel pipes manufacturers, suppliers, factory, STBA23 low alloy steel pipe, Q235 steel pipe, Q235 carbon steel round tube, ASTM A210 gr A1 seamless pipe, A53 Gr B round carbon steel tube, ASTM A192 High Pressure Carbon Steel Boiler Tube



